ryersonbuilds@ryerson.ca

Author archive: ryersonbuilds_2016

Tour the New SLC!

http://www.ryerson.ca/content/ryerson/news/events/General_Public/20150223-sls-tour.html February 20, 2015

A Look Inside the Student Learning Centre

http://ryerson.ca/ryersontoday/data/news/2015/02/20150211-a-look-inside-the-student-learning-centre.html February 17, 2015  

Watch Ryerson’s Newest Building Rise at Hyper Speed

Watch Ryerson’s Newest Building Rise and Hyper Speed February 2, 2015

Church Street Development set to transform downtown

Church Street Development set to transform downtown October 22, 2014 The multidisciplinary building is set to open just north of Dundas Street in the 2018 academic year. Ryerson strengthened its reputation as a city builder Tuesday as President Sheldon Levy shared the design of the new Church Street Development (CSD). Set to open just north…

If you build it, they will come

August 6, 2014 Mohamed Lachemi, provost and vice president academic, took students on a first-time tour of the Student Learning Centre (SLC). Slated to open in January 2015, recent SLC activity has been on the enclosure of the building. The installation of the exterior curtain wall is on schedule with more than 75 per cent…

SLC Tower Crane Removal

July 03, 2014 EllisDon has scheduled the dismantling and removal of the Student Learning Centre (SLC) tower crane starting Tuesday, August 5 until Thursday, August 7. During this time, Gould Street will be closed to vehicular traffic from Church to Bond Street to allow tractor trailers access to the SLC site. The pedestrianized area of Gould…

A Funky Façade

Exterior work continues on the new Student Learning Centre at Ryerson University in Toronto, Ont. EllisDon Corp. is construction manager for the eight-storey project being built on the former Sam the Record Man site. Designed for LEED Silver certification, the new centre will provide space for individual and group studies, have an elevated plaza, ground…

Breaking: New health science building plans announced for Church Street Development

Construction on the $104.4 million building is expected to begin in late 2015. March 13, 2014 By: Ryersonian Staff Ryerson University has officially announced plans for its new health science building at 300 Church St. The property is currently a parking lot beside the Interior Design building referred to as the Church Street Development (CSD)….

A Unique Building

The SLC will be a state-of-the-art addition to the city and the university campus, providing students with a variety of spaces for individual and group study. Along with the glass façade, there will be an elevated plaza, a bridge connecting to the Library and academic, study and collaborative spaces. The Yonge Street frontage will feature…

Architects Perkins+Will to design Church Street Development

Architects Perkins+Will to design Church Street Development September 04, 2013 Ryerson University has selected Perkins+Will as the architects for the Church Street Development at 300 Church Street. “We are very pleased that this internationally acclaimed firm will design Ryerson’s new Church Street Development,” said President Sheldon Levy. “This building will be a touchstone for the…

Menu